Legacy data centres to hybrid cloud, across two regions
A healthcare provider operating across APAC and the USA was running end-of-life data centres with no meaningful redundancy. We designed and delivered a hybrid architecture spanning Azure, AWS and a modernised private cloud, retired the legacy estate, and handed over a fully documented environment to their operations team.
Ageing data centres across both regions had reached end of life. A single power or hardware failure could have taken patient services offline in multiple countries at once. There was no disaster recovery capability, no visibility across the data estate, and no handover documentation for the operations team. Two earlier modernisation attempts had stalled on the complexity of the dependency map.
The Suite carried this engagement end to end. Agentic discovery mapped the estate and its dependencies in a fraction of the manual effort, migration sequencing was generated and continuously re-planned against live risk, and governance evidence was produced as the work happened. That is where the 60% cost reduction and 75% acceleration came from — not from cutting scope.
- Agentic discovery across the APAC and USA estate, mapping every workload, dependency and point of exposure
- Hybrid target architecture spanning Azure and AWS connected to a modernised private cloud, designed so a regional outage does not interrupt service
- Migration and retirement sequencing generated by the Suite and re-planned continuously against live risk, with rollback at every stage
- Unified data governance giving the client real-time visibility across the estate for the first time
- New data centre delivered with full site readiness — power, cooling, connectivity, security
- Legacy decommissioning, data sanitisation and asset disposal under healthcare compliance requirements
- Runbooks, handover documentation and training produced for the internal operations team
The client now runs a resilient hybrid environment designed to keep patient services available through a regional outage. Legacy data centres are retired, the operations team holds a fully documented environment, and the cutover completed with no unplanned disruption in either region. Delivery cost came in 60% below the comparable manual programme estimate, and deployment ran 75% faster.